1. Carefully remove all packing materials from racks
and tanks.
2. Set unit up according to installation instructions
on following pages.
3. Adapt hoses to available supply and drain lines.
4. Run test of developer (CD) and bleach/fix (BX)
baths.
5. Drain water, fill with chemicals and begin
processing.