Instruction Manual
for the Fujimoto CP51
Roller Transport Processor
Main Body

Index
- Unpacking
- Specifications
- Pre-Installation
- Installation
- Operation
- Troubleshooting
- Processing Data
Unpacking 1
1.1.
Unpacking Your CP51 Processor
Your Fujimoto processor MB will arrive in a sealed carton.
The shipping weight of the unit is approximately 112 pounds. Due to its physical size and
weight, it is advisable to have at least two people move the processor, when necessary.
The processor may arrive secured to a pallet depending on whether you ordered additional
modules.
Once the carton is located near the installation site,
carefully cut the packing tape and open all four flaps completely. The racks and
accessories for your processor are packed in separate boxes and are located on the top
(Figure 2). Remove all of the smaller boxes and place them aside until you have exposed
the main body. Save all the packing materials.
The main body will be wrapped in plastic and surrounded by
padded cardboard inserts that secure the main body from damage. Before you can remove the
main body from the shipping carton, all accessory boxes must be removed.
Once all accessory boxes are removed, lift the flaps that
cover the main body (Figure 3). Remove the spare parts box (labeled "parts"),
set it aside, and then remove the two inserts by pulling them straight up. The main body
is now ready to be removed from its carton.
It does not matter from which side the processor is lifted.
It is important, however, that two people remove the processor from its carton to avoid
personal injury as well as damage to the processor. When removing the processor, be sure
it is lifted from the bottom. You may find it easier to remove the plastic around the
processor first in order to avoid having the processor slip while it is being removed from
its carton (Figure 4).
Once the processor has been removed from its carton, place it
on the surface where you intend to operate it. (See the chart in Chapter 3.5 referring to
minimum table/counter sizes.) Check all packing materials for any small parts that may
have fallen out of place during shipping.
1.2 Hidden
Damage
Check the processor for any damage and, if found, immediately
contact the shipping company that delivered the unit or the dealer from whom you purchased
the unit.
1.3 Packing
Material
It is advisable to retain and store the carton and packing
material for future shipping and/or moving of your processor to prevent damage in transit.
Back to Top
Specifications
2
2.1
CP51 Main Body Specifications
- Paper Compatibility RC paper.
Maximum size of 510 mm wide by 610 mm long. (20 inches wide by 24 inches long) Minimum
size of 76 mm wide by 100 mm long. (3 inches wide by 4 inches long)
- Transport System Roller Transport
System
- Processing Time 45 seconds to 5
minutes (per bath)
- Transport Speed 52 - 350 mm per
minute (2-14 in./min.); transport speed is digitally displayed up to 3 figures, and
adjustable by a single knob control.
- Acceptable Processes RA-4, EP-2,
B&W
- Power Requirements Single Phase,
200/220/240 volts, 50-60 Hz, 600/680/800 watts
- Processing Baths 2; solution
capacity of 6 liters each
- Chemical Circulation 1st and 2nd
baths use magnetic drive pumps and built-in chemical filters
- Replenishment 6 infrared sensors
calculate paper's area (both length and width) and activate the replenishment pumps to
provide individually accurate chemical replenishment for the surface area measured.
- Temperature Control Temperature
control is digitally displayed for each solution tank in the MB. In addition, the
following additional information is displayed; heater "on" lamp, overheat
warning lamp. Temperatures are programmable up to a maximum of 50o C, and accurate to
±0.1o C.
- Dimensions 815 mm long, 645 mm wide,
300 mm high (approximately 32" L x 25" W x 12" H)
- Hose Dimensions Replenishment pipe:
8mm (5/16") O.D. Overflow hoses: 15mm (9/16") O.D. Drain hoses: 8mm (5/16")
I.D.
- Shipping Weight 52 kg, (112 lbs.)
Other Features---
- Standby Function If, after 45
minutes, paper has not been inserted into the processor, the circulation pump and roller
transport motor automatically stop their "full-time" operation. While in this
energy saving Standby mode, they turn on for approximately 4 seconds and off for
approximately 10 seconds until paper is inserted into the processor, or the power switched
off and on again. Then the CP51 resumes normal operation.
- Ventilation Fan This fan has been
designed to help prevent crystallization and condensation of chemicals.
- Safety Device A built-in, overheat
sensing switch shuts down the heating system, if an overheat condition is detected.
2.2
CP51 Main Body Parts Check List
| Quantity |
Description |
Part No. |
| 1 |
CP51 Main Body |
411405 |
| 1 |
Top Cover/ Light-tight Cover |
65132 |
| 2 |
Chemical recirculation filters |
65120 |
| 1 |
Inlet Rack (with 6 IR sensors) |
65224 |
| 1 |
Main Body Rack #1 |
65130 |
| 1 |
Main Body Rack #2 |
65381 |
| 1 |
5 Amp fuse |
65102 |
| 2 |
Funnels |
65307 |
| 3 |
Extension hoses for overflow |
65268 + 65380 |
| 2 |
Drain overflow hoses |
(Call) |
| 1 |
Wrench for adjusting leveling legs |
65280 |
| 1 |
100 ml Graduated cylinder |
3303 |
| 1 |
This instruction manual |
66049 |
Please check to make sure that you received all of the parts
listed above. If something is missing, contact the JOBO Customer Service Department at
734-677-6989, extension 4721.
2.3 CP51 Main Body Parts and Functions
(in alphabetical order)
Name / Function
1st Rack This is the developer rack
in the 1st solution bath.
2nd Rack This is the rack in the
2nd solution bath, normally used for bleach/fix or fixer, depending on the specific
process in use.
2nd Bath Water Supply Hose Incoming
water connection for conversion of MB 2nd bath to a flowing water wash.
Adjustable Power Switch Changes
circuitry among 200/220/240 volt settings.
Control Drawer This houses the main
PC Board for control of the speed of the processor, replenishment rates and other
functions.
Drain Hose There is a drain hose
for emptying each bath
Drive Shaft Transmits rotation of
drive motor to each rack.
Fuse Normally rated 5 amps.
Gearbox Drain Hose Drains built-up
water or chemicals from gearbox (drive shaft area).
Inlet Rack This is the small rack
which receives the incoming sheets of paper, equipped with IR sensors to measure the
surface area.
Inlet Rack Connector Provides
electrical connection for IR sensors of inlet rack
Light-tight Cover After paper has
been inserted into the processor and the cover closed, this cover protects the paper so
room lights can be switched on.
Main Gear The primary gear attached
to each rack which rests on the Worm Gears of the Drive Shaft.
Operation Control Panel Displays
temperature, has "hidden" contact buttons for programming high and low
temperatures.
Rack Assembly of rollers, springs
and gears which transports the paper through each individual bath.
Replenishment Hose Supplies fresh
replenisher to each solution bath.
Ventilation Fan Evacuates
condensation and heat from the processor.
Water Supply Pipe Incoming water
connection for conversion of MB 2nd bath to a flowing water wash.
W/D, S/D Connector Wire Signal wire
which sends signal from Inlet Rack to activate Dryer when paper is inserted into processor
and also sends information to activate replenisher system.
Worm Gear Corkscrew shaped gear(s)
on drive shaft that turns Main Gear of individual solution racks
Back to Top
Pre-Installation
3
3.1 Proper Conditions
For Setting Up The CP51 Processor
- Light-tight darkroom
- Adequate ventilation
- Nearby water supply and drain for use with W/D Module
- Safe electrical conditions. We strongly recommend the use of a
Ground Fault Circuit Interrupt (GFCI) in the wiring for your CP51. It detects possible
shock hazards and shuts off the current in a fraction of a second, to protect you from
possible harmful shocks.
- Air conditioning/heating (as needed)
NOTE: Room temperature should be at least 5o
C (9o F) lower than the programmed temperature of the CP51 processor. i.e. If the CP51 is
set for 30o C (86o F), then the room temperature should be at or below 25o C (77o F). This
is necessary because the circulating pumps and other components will give off some heat as
the solutions pass through them.
3.2 Water Supply
Requirements In Use With W/D Module
- Water Temperature 30-35o C/86-95o F
(for RA-4; for other processes see chemical instructions)
- Water Pressure 1.5-5 Kg/cm2 (21-70
psi)
- Water Volume 1.5 liters per minute
(approx. 1/3 gallon per minute)
- Water pipe inside diameter 13 mm
(1/2")
- Filter recommendation 50 micron or
smaller (as low as 5 microns) mounted in building's plumbing system near darkroom.
3.3 Drain Requirements For W/D Module
- Drain flow at least 1.5 liters per
minute (approx. 1/3 gallon per minute)
- Drain overflow hose inside diameter
13mm (1/2")
- Pipe material Do not use copper or
brass due to corrosiveness of effluent.
3.4
Weights of Processor Components
Consider the weight of the modules as shown below, when you
are deciding where to locate your processor. Be certain the supporting surface can handle
the weight load.
Table of Processor Weights
| Modules |
Weight Empty |
Weight with Solutions |
| MB |
51 Kg (112 lbs.) |
63 Kg (139 lbs.) |
| MB + W/D |
96 Kg (211 lbs.) |
120 Kg (264 lbs.) |
| MB + S/D |
102 Kg (224 lbs.) |
126 Kg (277 lbs.) |
3.5 Table and Counter Surface
Dimensions
The figures in the chart below represent the surface
dimensions needed on a free-standing table to support the adjustable feet of the CP51.
Counters will need an additional 7-8 inches in depth due to chassis size and space needed
for hoses behind the modules.
Support Dimensions
| Modules |
Table Dimensions |
Counter Dimensions |
| MB |
580 x 600 mm (23 x 24") |
580 x 800 mm (23 x 32") |
| MB + W/D or S/D |
1050 x 600 mm (42 x 24") |
1050 x 800 mm (42 x 32") |
3.6 Power
Requirements
The Main Body and W/D (or S/D) each have their own power
cords. You will need to have 2 NEMA code 6-20-R sockets to power the processor.
We strongly recommend that the circuit be Ground Fault
Circuit Interrupt (GFCI) protected. In case of electrical shock hazard it will shut off
the power in a fraction of a second to protect you. from danger.
The single phase "220" volt current most often
found in the U.S.A. is generally either 208 or 240 volts. Either will be acceptable. In
the chart below, the amperage has been calculated for 208 volts, providing a greater
margin of safety for other voltage levels.
Power Requirements
| Module |
Voltage |
Wattage |
Amperage |
| Main Body |
208-240 |
810 |
3.9 |
| W/D Module |
208-240 |
2,200 |
10.6 |
| S/D Module |
208-240 |
2,900 |
14 |
To determine the minimum circuit amperage needed, add
the amperage of the various modules to be used. Add a safety factor of 25% to the sum of
the amperages to determine a minimum load-handling capability needed for your circuit.
(i.e. MB 3.9A + W/D 10.6A = 14.5A +25% (3.625A) = minimum circuit of 18.125 amps, or
rounded up to a 20 amp circuit.)
Back to Top
Installation
4
4.1 CP51
Installation
- Remove the Main Body from its packaging. Get assistance since
the Main Body is quite heavy. Check all packing materials carefully for any components.
Funnels, a graduate, the leveling wrench and other small parts may be concealed inside
some cardboard packing materials.
- Place the MB on a table or counter. Do not "power
up" your processor without liquid in the baths! Failure to have liquid properly in
each bath may burn out the heaters and/or heater safety systems, and possibly void the
warranty. Avoid installing the racks until you get to step 4.4.2. They will get in the way
prior to that step.
- Level the MB using the wrench supplied in package. Place your
level on the chrome rails to check lateral level. (See illustration number 5.) Place the
level on the dividing wall between the 1st and 2nd baths to determine side-to-side level.
This is very important for quality processing.
- Pull out the drain hoses from their storage within the lower
compartment of the MB. When you see the colored tapes wrapped around the hoses emerge from
the MB, stop pulling out the hoses. The tapes are a warning that you have pulled them far
enough!
- Remove any additional W/D or S/D modules from their packaging
and place them to the left of the MB.
- Adjust the leveling legs of the additional module. First
adjust the height to match that of the MB. Then level each module. It is very important
that both modules are level and at the same height. Otherwise the drive shafts of the
individual modules will not align properly. When the drive shaft couplings meet easily,
then you know the modules are aligned well. You can visually check the height of the
modules by comparing the black "waistbands" of each unit.
- Insert one of the supplied funnels into the drain hole at the
bottom of the bath. Pour warm water into the funnel until the spray bar starts to emit
water. Then you can pour in the rest of the water without using the funnel. This procedure
is essential to prime the circulation pumps. IT MUST BE DONE EVERY TIME YOU FILL THE
CHEMICAL BATHS! Fill each bath up to the line (several inches below the top of the
dividing wall.) Do not "power up" the processor yet.
CAUTION: Do not use water
hotter than 50o C/ 122o F. Hot water is not necessary at this point in the preliminary
installation.
- Adjust the processor legs if necessary and check with your
level to ensure the water surface is exactly on the line in the separate modules.
4.2
Preparation of the Environment
- Prepare plastic containers for replenishment and overflow for
each module. CAUTION: always store the plastic containers lower than the CP51
itself, such as under the table supporting the processor.
- Fill the replenisher containers with water (for testing and
calibrating.)
- Run hoses from the overflow lines to overflow containers to
catch effluent chemicals.
- Use the provided extension hoses as needed. Remember to remove
the extensions when storing the drain hoses, inside the processor's lower housing.
- Connect W/D overflow hoses to a drain line capable of handling
the 1.5 liter per minute flow rate of the wash water which will come from the W/D in use.
4.3 Filter Setup
- With the power OFF (!) remove the filter chamber lid and
insert the filter. Replace the lid on the chamber. CAUTION! Whenever you remove the filter
chamber lid, at any time in the life of the CP51 processor, be sure to have the power off,
or you will have quite a mess as the chemical is pumped up from the filter chamber.
- There are also small filters mounted in-line on the
replenisher hoses. The replenisher hose should be removed from the replenisher storage
vessel before opening the in-line filter housing. But also be ready to catch the liquid
draining from the end of the hose in a suitable container.
4.4 Test Run
- After pouring water into each bath (using the funnels as
described above), turn the power on at the main body. While there are no racks in the
baths, check that the spray bars are working normally; water should be coming out of each
hole in the bar. If the water is not flowing from the spray bar, switch off the main body,
open the filter chamber lid, and close it again. Switch the power back on again. This
procedure gets rid of any air trapped inside the circulation system, which can interfere
with proper solution circulation. (When there is an air lock in the circulation system,
you will usually hear a screeching sound that may cause you to think the bearings of the
pump motor have been ruined. Normally, this is not indicative of damage to the bearings if
you shut off the processor quickly, and correct the circulation problem as described
above.)
- Insert each rack. The worm gear on the drive shaft, and the
main rack gear should mesh properly. Plug in the connector of the inlet rack to the
receptacle on the end of the main body.
CAUTION!
The power MUST be switched OFF when there is no liquid in the
chemical baths. Operating the processor with "empty" baths can severely damage
the machine.
4.5 Chemical Temperature Setup for MB
In the following section, HIGH SET refers to a temperature
0.5o C above the "target " temperature of the process you will run. For example,
35.5o C (96o F) when the process will be run at 35.0o C (95o F). The purpose of HIGH SET
is to program a temperature that will activate an "overheat" warning LED on the
processor. LOW SET refers to the actual temperature that is to be set for the process. In
the example above this would be 35.0o C (95o F). The LOW SET is used to program the actual
process temperature. Any temperature between the HIGH SET and LOW SET programmed
temperatures, is considered an "acceptable" temperature range for processing,
but the processor will normally hold the low-set temperature to ±0.1o C.
In the following section, four single letters are used to
represent function buttons on the control panel of the CP51 MB. [S] represents
"set". [D] represents "down". [U] represents "up". [R]
represents "reset". (See illustration number 6.)
- Push the [S] pad on the control panel for the first bath for
at least 2 seconds. The 1st bath display will show HIGH SET and 50o C, which is the
maximum programmable temperature.
- Push the [D] and set the temperature 0.5o C higher than the
"target" temperature for this process. (35.5o C for RA-4.)
- Push the [S] pad. This will lock in the temperatures for the
HIGH SET. Now the display will show LOW SET and -20o C. (Please note: MINUS 20o C)
- Push [U] on the display setting pad, and program the LOW SET
for the "target temperature". (35o C for RA-4.)
- When the set pad [S] is pushed, a triangular arrow and the
actual bath temperature will be shown in the display. This indicates the temperature
programming has been completed for the 1st bath.
- Repeat the entire procedure for the second (Bleach) bath.
4.6 Warning
Lamp
A warning lamp will come on if the chemical temperature of
the first bath goes higher than the HIGH SET programmed temperature. The lamp tells you
the temperature of the 1st bath is too high. If this lamp comes ON, turn off the power
switch and wait for the temperature to go down.
4.7 Reset
Switch
If the programming cannot be done properly, or the operation
control panel should show something wrong during programming of the temperatures, push the
RESET button to go back to the default settings. Push RESET [R] and the Fujimoto &127
symbol at the same time. Then start the temperature programming sequence for that bath
from the beginning again.
4.8
Operation Control Panel
- Green Lamp -- When a print is entering the processor, a green
lamp will illuminate behind "Paper" on the display panel. After the print has
passed through the inlet rack the green lamp will switch off. Wait a few seconds before
feeding another print into the processor, to allow the first print to pass through the
inlet rack completely.
- Warning Lamp -- If the warning lamp illuminates, the
temperature is too high. Turn off the power and open the entire top cover of the processor
to allow the temperatures to cool.
4.9 Setting the Paper Transport Speed
The transport speed control is located in the control drawer.
The speed is displayed in millimeters per minute. Refer to the chart in chapter 7.1 to
determine which speeds to set for different developing times. For RA-4 set 347 mm/min. to
get 45 seconds in each bath.
4.10 Insertion
Place the rack in the solution slowly and carefully to avoid
any spills. Be certain to properly align the main gear of the rack with the worm gear of
the drive shaft. Check to see the sensor connector of the inlet rack is firmly plugged
into its socket. CAUTION! Be careful to avoid ANY moisture reaching the IR sensors of the
inlet rack. They are extremely susceptible to damage from liquids. When pouring liquids,
remove the inlet rack from the area where liquids could possibly splash. After placing the
racks in the solution baths check the machine again to be sure the processor is properly
leveled.
4.11 Replenisher Rate
Adjustment (Control Drawer)
Dial No. 1 adjusts the replenishment rate for the 1st bath.
Dial No. 2 adjusts the replenishment rate for the 2nd bath.
Dial Setting |
ml/minute repl. |
1 |
5 ml |
2 |
10 ml |
3 |
15 ml |
4 |
20 ml |
5 |
25 ml |
6 |
30 ml |
7 |
35 ml |
8 |
40 ml |
9 |
45 ml |
Each increment on the dial scale increases the
replenishment rate by approximately 5 ml. Please refer to the table in chapter 7.3 for a
breakdown of different chemicals and replenishment levels. If you are trying to set 38 ml,
then set the dial to the nearest ml increment, i.e. setting #8 which is approximately 40
ml. The CP51 automatically calculates the replenishment amounts for each paper size, based
on both the width and length, as measured by the six IR sensors of the input rack. The
replenishment values of the scale must be considered approximate, since the actual
delivery rate may be affected by such things as the length of the replenisher hose, and
the Hz value of the current powering the processor.
For precise replenishment control it is best to test
the actual delivery rate of replenisher. Fill a graduate (such as the 100 ml graduate
supplied with the CP51) with 100 ml of developer replenisher. (Water has a higher
viscosity than developer. It is more accurate to test with the actual solution when you
have finally set up the processor with working chemicals than it is to test with water.
But checking it first with water will get you very close to your final setting.) Make sure
the replenisher line has already been "primed" so it is ready to pump
replenisher when you place it in the graduate. Place the replenisher hose into the
graduate and insert a single sheet of 8x10" paper into the processor. It is best to
insert it with the 10 inch edge going in first. After it has passed through the intake
roller, wait one full minute before removing the replenisher hose from the graduate to
read the remaining volume of solution. Actual replenishment rates will vary from one
chemical manufacturer to another. At the time these instructions were prepared, Tetenal
RA-4 developer, from JOBO, had a replenishment rate of 8.25 ml per 8x10" print.
Therefore you would adjust the replenisher control dial until the actual replenisher
volume removed from the graduate was 8.25 ml. Do the same for the Bleach/Fix according to
the chemical manufacturer's instructions. The Bleach/Fix rate may be different than the
developer.
Installation and Testing are now complete!
Drain the MB
Turn off the main body power switch. Remove the drain
hose cap so the water can drain from the bath(s). Replace the cap after you have drained
the solution(s).
CAUTION: Before draining,
make certain the power switch is OFF, otherwise the heater and the agitation pump
can be seriously damaged!
Back to Top
Operation 5
5.1
Loading the MB with Chemicals
- Remove the racks from each bath. Remove the inlet rack so it
will not get splashed. Insert a funnel into the drain in the bottom of the 2nd bath.
- Pour in 6 liters of the appropriate chemical (bleach/fix for
RA-4). While pouring, look to see that the solution is coming out of the holes in the
spray bar. Carefully lower the 2nd rack into the 2nd bath. Then carefully check and clean
(if necessary) any droplets or spills of bleach/fix that may have gotten into the empty
1st bath. CAUTION: Even small amounts of bleach/fix will affect developer. Avoid splashing
or spilling, but if necessary, clean the spill immediately and thoroughly. NOTE: The
reason for filling the 2nd bath first, is to allow you the opportunity to clean any spills
which might otherwise ruin the developer. While you don't want to spill developer in the
bleach/fix either, tiny amounts mixed into the entire 6 liter bath will have much less
effect on the bleach/fix, than bleach/fix would have on the developer.
- Insert the other funnel into the drain in the bottom of the
1st bath. Pour in 6 liters of working strength developer. While pouring, look to see that
the solution is coming out of the holes in the spray bar. Carefully lower the 1st rack
into the 1st bath. Then clean up any droplets or spills that might have occurred while
pouring.
- Fill the replenisher vessels (not supplied with the CP51
processor) with replenisher. Insert the developer hose into the developer replenisher
vessel and make sure the tube at the end of the hose reaches the bottom of the vessel. Do
the same for the bleach/fix (or second bath) replenisher vessel.
- Set up vessels to catch the overflow from the 1st bath and 2nd
bath. They should be AT LEAST as large as the replenisher supply vessels.
- Turn the power switch ON. If you hear any screeching sound,
IMMEDIATELY turn the power switch OFF. The screeching sound is typical if you have an
air-lock in the circulation pump system. With the power switch OFF, briefly open
and close the chemical filter chamber to release any air trapped within. Switch the power
on again to check the circulating system.
- Press the manual replenishment buttons in the control drawer
intermittently and check whether replenisher is being pumped up properly through the
replenisher hose. You can check it by either viewing the clear replenisher hose, or
noticing the solution exiting through the overflow hoses when the solution baths are full.
(The manual replenishment buttons are located in the control drawer, on the underside of
the chamber above the removable control drawer. The first button you reach activates the
1st bath replenisher pump. The second button activates the 2nd bath replenisher pump.) If
you have extreme difficulty getting either solution to begin pumping properly, raise the
replenisher supply vessel higher than the processor. Then press the manual replenishment
button again. Once the replenisher pump begins drawing the solution properly, place the
replenisher supply vessel below the processor again.
- Install the top cover over the processor.
- Check the temperature displays. If the displays show the
programmed temperatures, then you are ready to begin.
- Check the control drawer to see that you have set the correct
mm/minute speed for processing. (See the chart in chapter 7.1 for speed selections.) The
speed shown in the mm/minute display of the control drawer, will fluctuate easily.
Therefore it is not critical to be "exactly" at 347 mm/min. You will not see any
difference at ±5 mm/min when using speeds over 150 mm/min. Close the control drawer
before processing. The LED's showing paper speed could otherwise fog your color paper.
- Open the light-tight cover in the darkroom. Insert an exposed
sheet of paper, emulsion side down on the stainless steel feeder tray. Use the edge of the
tray to align the paper. Gently slide the paper down the feeder tray until you feel the
lead edge of the paper being grabbed by the intake rack. Then let go and let the processor
advance the print. Close the light-tight cover, and turn on the room lights.
CAUTION:
Remember when test printing, do not use prints smaller than 40 x 100 mm (1-5/8 x 4
inches). Use of smaller prints may cause the processor to jam. Insert prints properly
"squared up" by aligning the paper with the edge of the feeder tray. When
processing prints 8x10" or smaller, you can maximize the processor's throughput by
alternating the prints on either side of the feeder tray.
When paper enters the inlet rack, a green lamp will turn on
behind the word "paper". Once the paper has passed through the inlet rack, the
lamp will turn off. This means the print is now passing through the processor and has
cleared past the IR sensors of the inlet rack. Please check the paper indicator lamp each
time you feed prints into the processor. Once the indicator lamp is illuminated you can
close the light-tight cover. After the light-tight cover has been closed, you can turn on
the room lights if needed and begin working on the next print. Please wait 5-10 seconds
after the paper lamp has turned off before inserting the next print.
IMPORTANT
Even though the paper indicator lamp is off do not open the
light-tight cover in "daylight". Only open the light-tight cover with the room
lights off if there is any paper still in the MB! The paper indicator light only indicates
the print is passing the IR sensors. If you open the light-tight cover while paper is
still in the MB, light can reach into the 1st or 2nd bath and ruin any prints still there.
If you don't have a W/D or S/D module connected to your MB,
please wash your print immediately after it has been processed.
If you have prepared a stack of prints to be processed, feed
them into the processor as described above. Wait 5-10 seconds after the paper indicator
lamp has gone out before feeding the next print. This allows a small gap between prints to
prevent them from interfering with each other. If you are feeding a lot of prints into the
processor you may need to slightly increase the heat setting for the W/D or S/D module to
assure that the prints are dry when they emerge. This is because normally the dryer will
have at least some recovery time between prints. When a large quantity of prints is being
sent through the processor, there is virtually no recovery time available for the dryer
between prints.
5.2
Maintenance After Use
- Turn OFF the power switch on the MB.
- Do not drain the chemicals from their baths.
- Remove the complete top cover to avoid a buildup of moisture.
- Remove the 1st bath rack and then the 2nd bath rack being
careful to avoid dripping solutions from either rack into the other bath. Clean the racks
being certain to rotate the main gear to turn the rollers for a thorough rinse under
running water. Hang the racks to allow them to dry.
- Cover the remaining solutions in the 1st and 2nd baths with
the optional floating lids. (Part No. 411423)
CAUTION: The
inlet rack has many electronic components. DO NOT clean the inlet rack with water. If
needed, please wipe the rollers with a damp cloth.
5.3
Maintenance Before the Next Use
- Check the replenisher level in the replenisher supply vessels.
If there isn't enough replenisher, the hose will suck up air and there will be an air lock
in the hose and the replenishment pump.
- Check the overflow catch vessels. Empty them as needed.
- Gently and carefully place the 2nd and 1st racks back into
their respective baths. This time you may want to cover the "other" bath with a
sheet of plastic while you are lowering the rack into "this" bath to prevent any
possible splashing from contaminating the chemicals.
- If the solution level has dropped slightly in the 1st or 2nd
baths, add water to bring the solution level back up to the level line, to make up for
evaporation.
- Turn the power switch ON and wait until the chemical
temperature reaches the programmed temperature. Now the CP51 is ready to start work.
5.4 Shut Down for Longer than One Week
- Turn the power switch OFF.
- Drain all chemicals.
- Remove each rack and wash thoroughly. Remember to rotate the
main gear of each rack to eliminate any "hidden" chemicals between rollers.
Leave the racks on a bench or hang them to dry naturally.
- Place warm water in each bath and turn the power switch ON for
approximately 30 minutes. This allows the water to thoroughly clean throughout the
processor, including inside the pumps and heaters.
- Remove the replenishment hoses from their respective
replenisher supply vessels and insert them into separate water containers. (If you use a
single water container for both replenisher lines, you may cause contamination.) Push the
manual replenishment buttons (located inside the control drawer housing) intermittently
for each bath. This will clean and flush out a buildup of chemicals in the hose. Repeat
this step at least 3 times. Finally leave some water in the replenishment pumps to keep
the valves lubricated.
- Turn the power switch OFF. Drain the water from the baths.
Remove the circulation filters from their chambers and store them in separate containers
of water. (Mark the containers for DEVELOPER and BLEACH/FIX so that there will be no
future chance of contamination.) If the filters dry out with even a trace of the chemicals
in them, they may become blocked and useless.
- Wipe down the processor with a clean dry cloth.
5.5
Regular Maintenance Schedule
Weekly Maintenance
- Remove the top cover and clean it inside and outside.
- Wipe each roller on each rack with a damp cloth.
- Clean the area around each bath.
- When not in use, remove the top cover to avoid condensation
buildup.
Monthly Maintenance
- Drain all chemicals and clean the 1st and 2nd baths and racks.
- Clean holes on agitation pipe thoroughly.
- Check the replenishment and circulation filters to make sure
there is no buildup of crystals or dirt. Replace if dirty.
- If you are using a W/D or S/D module, add a drop of oil to the
worm gear that drives the dryer rack. All the main gears and worm gears are silicone
impregnated, but the heat from the dryer, evaporates the silicone from the set closest to
the heat.
5.6 Optional Monthly Maintenance
Program
Use of JOBO Processor Clean II will do a remarkable job of
cleaning your CP51 with little or no "elbow grease" required. It is available in
two sizes; a 4 oz. pouch or a 4.7 lb. jar. The 4oz. pouch is too small to be practical for
the CP51. The quantity of powder in the 4.7 lb. jar (part no. 4135) is sufficient to clean
the processor approximately 8 times. It will clean the rollers, baths, pumps, heaters,
etc. by running the processor for at least 8 hours, or overnight.
- Drain all chemicals (you can save them for reuse after the
cleaning) and fill the 1st and 2nd baths with water. Remove the replenisher filters from
their housings, and store them in their own marked containers. Remove the replenisher
lines from their supply vessels, and put them in separate vessels of water.
- Turn the power switch ON and let the processor run for 10-15
minutes to flush out any remaining chemicals within the baths and their hoses.
- While the water is circulating in the baths, press the manual
replenisher buttons to clear any chemicals from the replenisher lines.
- Turn the power switch OFF. Drain the water from the baths and
partly fill them with about 3 liters of water. Remove the circulation filters and if they
are dirty dispose of them. If they seem clean, store them in their own marked containers
filled with water, for reuse later.
- Mix the Processor Clean II. Mix 6-3/4 oz., by volume, (about
200 ml) of the powder with about 2 liters of water. Pour this into the 1st bath and top
off with additional water until the solution just barely reaches the overflow drain.
- Mix 4-1/2 oz. (about 135 ml) of the powder with about 2 liters
of water. Pour it into about 3 liters of water already in the 2nd bath, and top off with
additional water until it just barely reaches the overflow drain.
- Turn the power switch ON and let the processor operate at
normal working temperature for at least 8 hours. Longer is okay. The processor will go
into its standby mode after 45 minutes. This is okay and will still give the cleaning that
you want. If you have the W/D or S/D module you can unplug from its power source to make
sure it does not operate during this time, since the dryer is not needed for the cleaning
function.
- After at least 8 hours, turn the power switch OFF. Remove the
racks and wipe the rollers with a clean cloth or paper towel. This is especially helpful
on the 1st rack where silver may tend to accumulate if it has not been cleaned weekly.
- Return each rack to its bath. Turn the power switch ON and let
it run for another 15-30 minutes. Then wipe the rollers on each rack again.
- Turn the power switch OFF. Drain the solutions from the baths
and refill the baths with water. Let the water circulate for 10-15 minutes.
- Repeat step 10 at least two more times.
- Install clean filters into the circulation filter chambers.
Refill the baths with their chemicals. Remember to fill the 2nd bath first, using the
funnel and then clean up any spills or droplets before filling the 1st bath with developer
using its funnel.
- Turn the power switch ON and when the solutions are up to the
programmed temperatures, begin processing.
Back to Top
Troubleshooting
6
CP51 power switch is on but machine isn't working.
- Check plug.
- Check that the breaker in the power box is on and has not
blown.
- Check the main fuse on the CP51 MB.
CP51 Power switch is on but chemicals don't
circulate.
- The circulation hose may be air locked. Turn the power switch
OFF.
- Remove the circulation filter chamber lid to release air.
- Replace the lid.
- Turn the power switch ON.
Paper doesn't come out.
- If paper is smaller than 100 mm / 4 inches long, lift up the
lid and take out the paper. It is too small.
- Make sure the main gear of each rack is properly seated on the
matching worm gear on the drive shaft.
- Make sure the standby function is off. (Turn the power switch
OFF. Wait a few seconds and turn the power switch back ON.)
When density is too light (prints from negatives)
- Check the developer temperature. Make sure it's not too low.
- Make sure of the developing time. Check the mm/minute display
in the control drawer to be sure it is appropriate for the chemicals in use.
- Make sure the developer solution isn't too weak from age or
under-replenishment, or if it's freshly mixed, make sure it was mixed accurately.
- Make sure the replenishment rate is set accurately and
delivering accurately.
When density is too dark (prints from slides)
- Check the developer temperature. Make sure it's not too low.
- Make sure of the developing time. Check the mm/minute display
in the control drawer to be sure it is appropriate for the chemicals in use.
- Make sure the developer solution isn't too weak from age or
under-replenishment, or if it's freshly mixed, make sure it was mixed accurately.
- Make sure the replenishment rate is set accurately and
delivering accurately.
When paper becomes scratched
- Is something stuck in the paper guide or inlet rack guide?
- Has each rack been installed properly?
- Are there any crystals or unwanted substances on the rollers?
When developer is not being replenished
- Check the replenishment dial in the control drawer. It should
not be on zero.
- Make sure the paper processed was not smaller than 76 mm / 3
inches wide. (Less than this width may pass between the IR sensors without activating the
replenisher pumps. This could also cause the dryer not to run, and the processor could go
into its standby mode.)
- Make sure the replenisher filter is clean.
- Make sure the replenisher filter chamber is tightly closed.
- Is the replenishment check valve in good condition?
- Make sure the replenisher hose is not bent severely; a
collapsed hose can stop the flow of replenisher.
Uneven development (lines on prints)
- If the size of the paper was small, make sure the processor
was not in standby mode. The 15 second cycle of turning on and off will cause the lines.
- Make sure the power switch has not accidentally been switched
off.
- Make sure the rollers are rotating smoothly.
- Check that the main gear and worm gear are properly
interlocked.
- Check that the processor is properly leveled.
Cloud marks on paper
- If inlet rack rollers are wet, please wipe dry. If they have
ever gotten developer on them, remove the rollers from the inlet rack. Clean them
thoroughly with a damp cloth and re-install them in the inlet rack after you have
thoroughly dried them.
Dirty paper
- Run 2-3 test prints all across the width of the processor, to
get rid of unwanted substances on the rollers.
- If the prints are still dirty, please clean the rack rollers.
- Make sure the W/D water is clean and flowing.
Paper is fogged
- Was the light switched on accidentally while processing?
- Is the top cover resting properly on the main body?
- Make sure the paper wasn't exposed to the temperature control
setting lamp on the operation control panel for too long.
- Are there any LED's in the darkroom anywhere. LED's have a
remarkable intensity and can easily fog color photographic paper. Make sure the control
drawer is closed; its LED's could fog color paper.
When the warning lamp remains on
- Room temperature is too high. (Room temperature should be at
least 5 C lower than the 1st bath programmed temperature. The motors and pumps of the
processor generate some heat and warm the solutions slightly.)
- Chemical solutions may not be circulating properly. Check for
an airlock in the lines. Turn OFF the power switch. Remove the circulation filter chamber
lid and put it back on. Turn the power switch back ON.
Back to Top
Processing
Data 7
7.1 Process Time and Transport Speed
If you would like to calculate your own transport speed,
there is a simple formula to assist you. 15,600 divided by the desired processing time in
seconds equals the transport speed in mm/minute, which is the number you will need to set
on the speed setting in the control drawer of the MB. For instance, if you are looking for
a developing time of 2 minutes 30 seconds (150 seconds) simply divide 15,600 by 150. The
answer is 104 mm/minute.
The chart that follows will simplify this for most developing
times, but you can use the formula if the developing time you want is not in the chart.
PROCESSING TIME / TRANSPORT SPEED REFERENCE CHART
Processing Time
in each bath |
Transport Speed
setting in control drawer (mm/min.) |
45 seconds |
347 |
1 minute |
260 |
1 minute 30
seconds |
173 |
2 minutes |
130 |
2 minutes 30
seconds |
104 |
3 minutes |
87 |
3 minutes 30
seconds |
74 |
4 minutes |
65 |
5 minutes |
54 |
7.2
Hourly Processing Capacity
The following chart illustrates approximately how many prints
of each size can be processed per hour at the various transport speeds shown.
Hourly Processing Capacity by Size and Speed
Print Size |
45 sec/bath
(347 mm/min) |
60 sec/bath
(260 mm/min) |
90 sec/bath
(173mm/min) |
210 sec/ bath
(74 mm/min) |
20x24" |
31 |
23 |
16 |
6 |
16x20" |
45 |
33 |
23 |
9 |
11x14" |
61 |
46 |
30 |
13 |
8x10" |
166 |
124 |
84 |
34 |
7.3
RA-4 Processing Data
Process Brand |
Developer temp/
replenishment rate |
Bleach/Fix temp/
replenishment rate |
Super Stabilizer/
replenishment rate |
Kodak RA-4 |
35o C ± 0.3o
38 ml/min |
32-38o C
38 ml/min |
30-37o C
79 ml/min |
Tetenal RA-4 |
35o C ± 0.3o
21 ml/min |
32-38o C
29 ml/min |
30-37o C
34 ml/min |
Konica CPK-20QA |
35o C ± 0.3o
29 ml/min |
30-36o C
38 ml/min |
30-37o C
45 ml/min |
Fuji CP40FAII |
35o C ± 0.2o
35 ml/min |
33-37o C
40 ml/min |
33-37o C
120 ml/min |
Agfa AP94 |
35o C ± 0.2o
28 ml/min |
30-36o C
38 ml/min |
30-37o C
79 ml/min |
Replenishment rate is based on maximum paper width.
All brands run at 347 mm/minute (45 seconds per bath)
7.4
Black & White Processing
Set temperature at 28o C for developer and fixing baths. (Use
rapid fixer.) Set transport speed at 347mm/minute (45 seconds each bath). It is important
to know that you cannot process at room temperature. Heat given off by the motors and
circulating pumps in the CP51 will heat the solutions generally 2-4o C above room
temperature. Most RC papers will process well at 28o C. (The CP51 is not designed
for processing fiber-based papers. They are too thick for the rack design and may
jam and cause damage.) Replenishment rates will vary by developer.
Back to Top
If you have any questions, contact us utilizing one of the
following methods:
Equipment or Processing Questions:
- Phone: Customer Service Department (734) 205-9421
e-mail: tech@jobo-usa.com
Repair Questions:
- Phone: Repair Department (734) 205-9420
- e-mail: repair@jobo-usa.com
- Telephone (734) 677-6989
- Fax: (734) 677-6963
-
- Postal address
- P.O. Box 3721, Ann Arbor, MI 48106
- Shipping Address
- 4401 Varsity Drive, Suite D, Ann Arbor, MI 48108
- Electronic mail
- Sales: sales@jobo-usa.com
- Equipment & Processing Questions: tech@jobo-usa.com
Repair Information: repair@jobo-usa.com
- Shipping or Billing Questions: help@jobo-usa.com
Webmaster: webmaster@jobo-usa.com
-
Back to Top