You will need:
Procedure:
1) Remove the Upper Head of the
ATL from the Lower Motor Unit as described in Bulletin # B005A for ATL-1,2,2+, and 3.
2) Disconnect the main power cord from the
electrical outlet!
NOTE: If the thumb
nuts are too tight, you may need to loosen them with a screwdriver.
3) Remove the four (4) thumb
nuts located underneath each corner of the motor unit on the outside of the black trough.
You will see four large slotted thumb nuts.
NOTE: If the thumb
nuts are too tight, you may need to loosen them with a screwdriver. |
 |
4) You may now remove the lower
motor unit by lifting it out of the trough.
Back to Top
If you have any questions, contact us utilizing one of the
following methods:
Equipment or Processing Questions:
- Phone: Customer Service Department (734) 205-9421
e-mail: tech@jobo-usa.com
Repair Questions:
- Phone: Repair Department (734) 205-9420
- e-mail: repair@jobo-usa.com
- Telephone (734) 677-6989
- Fax: (734) 677-6963
-
- Postal address
- P.O. Box 3721, Ann Arbor, MI 48106
- Shipping Address
- 4401 Varsity Drive, Suite D, Ann Arbor, MI 48108
- Electronic mail
- Sales: sales@jobo-usa.com
- Equipment & Processing Questions: tech@jobo-usa.com
Repair Information: repair@jobo-usa.com
- Shipping or Billing Questions: help@jobo-usa.com
Webmaster: webmaster@jobo-usa.com
-
Back to Top